2010
LEADING EDGE ASSOCIATES Co,. Ltd. is established ¥8,800,000yen in capital.

2011
Started selling vapor chambers.

2013
Started exporting alminum brazing flux for automotive heat exchanger industrial usage.

2015
Increased capital to ¥15,600,000yen.

2016
Started sales of tower type vapor chamber for high power.

2018
Introduced TVC temperature control system for electric vehicle power modules and battery packs and TVC temperature control system for High-voltage power transmission tunnels began construction.

2019
Moved to Tachikaawa, Tokyo.